loader image

Get In Touch

    Please prove you are human by selecting the star.
    Contract Administration & Post Contract

    Contract Administration & Post Contract

    06 Contract administration and post contract Note: Some of this scope may be undertaken by a project manager. Prepare and issue contract documents Visit the site periodically to observe the conformance with contract documentation and attend regular site meetings...
    Contractor Selection (Tender)

    Contractor Selection (Tender)

    05 Contractor selection (tender) Assist client in choosing preferred tender process and list of building contract tenderers Prepare and issue tender set to all tenderers Respond to queries from tenderers Together with Quantity Surveyor, consultants and client, review...
    Documentation

    Documentation

    04 Documentation Confirm type of building contract to be used Note that this affects the level of documentation provided by the architect and when it is provided to the builder Review detailed design against planning approval and any conditions of approval Review and...
    Design Development (Detailed Design)

    Design Development (Detailed Design)

    03 Design development (Detailed Design) Review and update brief (this may take the form of room data sheets and client approval of schematic design report) Develop the approved sketch design into a final developed design including plans at each level, elevations,...
    Schematic (Concept) Design

    Schematic (Concept) Design

    02 Schematic (Concept) Design Prepare sketch drawings and diagrams and other information to adequately explain the concept Prepare preliminary furniture and equipment layouts Undertake preliminary selection of materials and finishes Coordinate preliminary design input...